AP North Lake I, LP — Interconnection Queue Projects
AP North Lake I, LP is associated with 4 tracked interconnection projects representing 845 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 5 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 845 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 3 |
| California | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Charger Solar | 69877_CHPV1 | Solar | 394.4 MW | active | Refugio, Texas |
| Fighting Jays Solar Project | 62945_FJSOL | Solar | 227.5 MW | operational | Fort Bend, Texas |
| AP Sunray LLC | 64258_OCISR | Solar | 203.5 MW | operational | Uvalde, Texas |
| AP North Lake I, LP | 59610_APNLI | Solar | 20.0 MW | operational | Riverside, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through AP North Lake I, LP.
Start tracking with interXdata