City of Tallahassee - (FL) — Interconnection Queue Projects

City of Tallahassee - (FL) is associated with 13 tracked interconnection projects representing 962 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

13Projects
0Active
13Operational
0Withdrawn
962 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas13962 MW

Geographic footprint

StateProjects
Florida13

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Arvah B Hopkins688_2Gas259.2 MWoperationalLeon, Florida
Arvah B Hopkins688_CT 2AGas198.9 MWoperationalLeon, Florida
S O Purdom689_8Gas180.0 MWoperationalWakulla, Florida
S O Purdom689_9Gas90.1 MWoperationalWakulla, Florida
Arvah B Hopkins688_GT3Gas60.5 MWoperationalLeon, Florida
Arvah B Hopkins688_GT4Gas60.5 MWoperationalLeon, Florida
Arvah B Hopkins688_IC2Gas18.8 MWoperationalLeon, Florida
Arvah B Hopkins688_IC3Gas18.8 MWoperationalLeon, Florida
Arvah B Hopkins688_IC5Gas18.8 MWoperationalLeon, Florida
Arvah B Hopkins688_IC1Gas18.8 MWoperationalLeon, Florida
Arvah B Hopkins688_IC4Gas18.8 MWoperationalLeon, Florida
Sub 1261080_IC2Gas9.3 MWoperationalLeon, Florida
Sub 1261080_IC1Gas9.3 MWoperationalLeon, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through City of Tallahassee - (FL).

Start tracking with interXdata