Sub 12 (61080_IC1)

Sub 12 is a 9.3 MW gas interconnection project in Leon, Florida with a current status of operational.

9.3 MWCapacity
OperationalStatus
TALMarket
GasTechnology

Project facts

Canonical nameSub 12
Queue ID61080_IC1
Statusoperational
Source status(OP) Operating
MarketTAL
TechnologyGas
Capacity9.3 MW
StateFlorida
CountyLeon
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-10-01
Withdrawn date
Developer
Utility / transmission ownerCity of Tallahassee - (FL)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata