Elora Solar — Interconnection Queue Projects
Elora Solar is associated with 2 tracked interconnection projects representing 151 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 151 MW |
Portfolio by market
| Market | Projects |
|---|---|
| MISO | 1 |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Elora Solar | 63719_ELO | Solar | 150.0 MW | operational | Lincoln, Tennessee |
| Timmerman (CSG) | 65974_TIMM | Solar | 1.0 MW | operational | Lyon, Minnesota |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.