Guadalupe Blanco River Authority — Interconnection Queue Projects
Guadalupe Blanco River Authority is associated with 11 tracked interconnection projects representing 22 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
11Projects
0Active
4Operational
0Withdrawn
22 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 11 | 22 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 11 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Canyon | 791_2 | Other | 3.0 MW | operational | Comal, Texas |
| Canyon | 791_1 | Other | 3.0 MW | operational | Comal, Texas |
| TP 4 | 3586_1 | Other | 2.4 MW | suspended | Guadalupe, Texas |
| H 4 | 3583_1 | Other | 2.4 MW | suspended | Gonzales, Texas |
| H 5 | 3584_1 | Other | 2.4 MW | suspended | Gonzales, Texas |
| Dunlap TP 1 | 3582_2 | Other | 1.8 MW | operational | Guadalupe, Texas |
| Dunlap TP 1 | 3582_1 | Other | 1.8 MW | operational | Guadalupe, Texas |
| Abbott TP 3 | 3581_1 | Other | 1.4 MW | suspended | Guadalupe, Texas |
| Abbott TP 3 | 3581_2 | Other | 1.4 MW | suspended | Guadalupe, Texas |
| Nolte | 3585_1 | Other | 1.2 MW | suspended | Guadalupe, Texas |
| Nolte | 3585_2 | Other | 1.2 MW | suspended | Guadalupe, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Guadalupe Blanco River Authority.
Start tracking with interXdata