Dunlap TP 1 (3582_2)

Dunlap TP 1 is a 1.8 MW other interconnection project in Guadalupe, Texas with a current status of operational.

1.8 MWCapacity
OperationalStatus
ERCOMarket
OtherTechnology

Project facts

Canonical nameDunlap TP 1
Queue ID3582_2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyOther
Capacity1.8 MW
StateTexas
CountyGuadalupe
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1927-01-01
Withdrawn date
Developer
Utility / transmission ownerGuadalupe Blanco River Authority

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata