OUC — Interconnection Queue Projects

OUC is associated with 13 tracked interconnection projects representing 1,541 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

13Projects
6Active
4Operational
3Withdrawn
1,541 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar9656 MW
Gas2630 MW
Battery1225 MW
Coal130 MW

Geographic footprint

StateProjects
Florida13

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Bull Creek (Osceola Generating Station)202110Gas555.0 MWactiveOsceola, Florida
Malta Project202311Battery225.0 MWactiveBrevard, Florida
Stanton A201901Gas74.7 MWoperationalOrange, Florida
Harmony 2202003Solar74.5 MWactiveOsceola, Florida
Osceola Solar 2201702Solar74.5 MWwithdrawnOsceola, Florida
Withdrawn201802Solar74.5 MWwithdrawnOsceola, Florida
Holopaw Harmony201704Solar74.5 MWoperationalOsceola, Florida
Storey Bend201801Solar74.5 MWactiveOsceola, Florida
Storey Bend South202312Solar74.5 MWactiveOsceola, Florida
Orange county Taylor Creek201703Solar74.5 MWoperationalOrange, Florida
Osceola Solar 1201701Solar74.5 MWwithdrawnOsceola, Florida
Taylor Creek Two202313Solar60.0 MWactiveOrange, Florida
Stanton 1201902Coal30.0 MWoperationalOrange, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through OUC.

Start tracking with interXdata