Red River Clean Energy — Interconnection Queue Projects

Red River Clean Energy is associated with 9 tracked interconnection projects representing 1,622 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

9Projects
9Active
0Operational
0Withdrawn
1,622 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar51,014 MW
Battery4608 MW

Geographic footprint

StateProjects
Texas9

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Uva Creek Solar68739_UVAPVSolar301.0 MWactiveBorden, Texas
Gail Mountain Solar69506_GAIPVSolar244.4 MWactiveBorden, Texas
Resaca Oasis Storage69120_RESBSBattery200.7 MWactiveCameron, Texas
Concho Pearl Solar and Storage67956_CONPVSolar171.9 MWactiveConcho, Texas
Concho Pearl Solar and Storage67956_CONBSBattery162.4 MWactiveConcho, Texas
Cannibal Draw Solar and Storage68738_CANPVSolar149.5 MWactiveGlasscock, Texas
Chisme Solar and Storage68078_CHIPVSolar147.0 MWactiveBrown, Texas
Chisme Solar and Storage68078_CHIBSBattery146.0 MWactiveBrown, Texas
Cannibal Draw Solar and Storage68738_CANBSBattery98.6 MWactiveGlasscock, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Red River Clean Energy.

Start tracking with interXdata