Terra-Gen Operating Co-Hybrid — Interconnection Queue Projects
Terra-Gen Operating Co-Hybrid is associated with 24 tracked interconnection projects representing 2,185 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
24Projects
4Active
20Operational
0Withdrawn
2,185 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 14 | 1,325 MW |
| Battery | 10 | 860 MW |
Geographic footprint
| State | Projects |
|---|---|
| California | 24 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sanborn Hybrid 3 | 69956_S10BS | Battery | 210.0 MW | active | Kern, California |
| Sanborn Hybrid 3 | 69956_S10PV | Solar | 210.0 MW | active | Kern, California |
| Edwards Sanborn E1B | 65674_PV | Solar | 154.4 MW | operational | Kern, California |
| Edwards Sanborn E1A | 64878_PV | Solar | 149.3 MW | operational | Kern, California |
| Edwards Sanborn E4 | 65675_PV | Solar | 148.9 MW | operational | Kern, California |
| Edwards Sanborn E1A | 64878_BESS | Battery | 144.0 MW | operational | Kern, California |
| Edwards Sanborn E2 | 64879_PV | Solar | 137.8 MW | operational | Kern, California |
| Edwards Sanborn E1B | 65674_BESS | Battery | 136.0 MW | operational | Kern, California |
| Edwards Sanborn E2 | 64879_BESS | Battery | 120.0 MW | operational | Kern, California |
| Sanborn Hybrid 3 | 69956_S9 | Solar | 103.0 MW | active | Kern, California |
| Edwards Sanborn 1C | 68846_S6 | Solar | 102.0 MW | operational | Kern, California |
| Edwards Sanborn E4 | 65675_BESS | Battery | 100.0 MW | operational | Kern, California |
| Edwards Sanborn E5 | 65676_PV | Solar | 68.0 MW | operational | Kern, California |
| Sanborn Hybrid 3 | 69956_S8 | Solar | 55.0 MW | active | Kern, California |
| Edwards Sanborn E5 | 65676_BESS | Battery | 47.0 MW | operational | Kern, California |
| Edwards Sanborn 1C | 68846_S5 | Solar | 46.0 MW | operational | Kern, California |
| Edwards Sanborn S1 | 64929_PV | Solar | 44.6 MW | operational | Kern, California |
| Edwards Sanborn S4 | 65677_PV | Solar | 41.2 MW | operational | Kern, California |
| Edwards Sanborn S1 | 64929_BESS | Battery | 40.0 MW | operational | Kern, California |
| Edwards Sanborn S3 | 64928_PV | Solar | 37.7 MW | operational | Kern, California |
| Edwards Sanborn S3 | 64928_BESS | Battery | 33.0 MW | operational | Kern, California |
| Edwards Sanborn E3 | 64877_PV | Solar | 27.1 MW | operational | Kern, California |
| Edwards Sanborn S4 | 65677_BESS | Battery | 18.8 MW | operational | Kern, California |
| Edwards Sanborn E3 | 64877_BESS | Battery | 11.0 MW | operational | Kern, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Terra-Gen Operating Co-Hybrid.