Sanborn Hybrid 3 (69956_S8)

Sanborn Hybrid 3 is a 55.0 MW solar interconnection project in Kern, California with a current status of active.

55.0 MWCapacity
ActiveStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameSanborn Hybrid 3
Queue ID69956_S8
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketCISO
TechnologySolar
Capacity55.0 MW
StateCalifornia
CountyKern
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTerra-Gen Operating Co-Hybrid

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2026-11-012026-10-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata