Ouroboros Grid BESS Unit 6 — Interconnection Portfolio
Ouroboros Grid BESS Unit 6 is associated with 6 tracked interconnection projects representing 1,205 MW of requested capacity.
Entity resolution: this developer rolls up 6 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 6 | 1,205 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 6 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Ouroboros Grid BESS 4 | 28INR0427 | Other | 201.1 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 5 | 28INR0428 | Other | 201.0 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 6 | 28INR0429 | Other | 200.9 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 1 | 28INR0397 | Other | 200.8 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 2 | 28INR0398 | Other | 200.8 MW | operational | Cameron, Texas |
| Ouroboros Grid BESS 3 | 28INR0403 | Other | 200.7 MW | operational | Cameron, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor Ouroboros Grid BESS Unit 6's portfolio across all markets.
Start tracking with interXdata