Ouroboros Grid BESS 5 (28INR0428)

Ouroboros Grid BESS 5 is a 201.0 MW other interconnection project in Cameron, Texas with a current status of operational. It is proposed to connect at 79500 Palmito 345KV.

201.0 MWCapacity
OperationalStatus
CameronMarket
OtherTechnology

Project facts

Canonical nameOuroboros Grid BESS 5
Queue ID28INR0428
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCameron
TechnologyOther
Capacity201.0 MW
StateTexas
CountyCameron
Point of interconnection79500 Palmito 345KV
Requested (queue) date2025-08-18
Proposed in-service date
Operational date2029-06-01
Withdrawn date
DeveloperOuroboros Grid BESS Unit 6
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.