345kV bus of Turtle Creek Substation (GEN-2021-007)
345kV bus of Turtle Creek Substation is a 600.0 MW wind interconnection project in Knox And Cedar, Nebraska with a current status of withdrawn. It is proposed to connect at 345kV bus of Turtle Creek Substation.
600.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology
Project facts
| Canonical name | 345kV bus of Turtle Creek Substation |
|---|---|
| Queue ID | GEN-2021-007 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | NE |
| Technology | Wind |
| Capacity | 600.0 MW |
| State | Nebraska |
| County | Knox And Cedar |
| Point of interconnection | 345kV bus of Turtle Creek Substation |
| Requested (queue) date | 2021-05-10 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | 2024-10-07 |
| Developer | — |
| Utility / transmission owner | NPPD |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata