Knox And Cedar County, Nebraska — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Knox And Cedar, Nebraska, representing 1,200 MW of requested capacity.

4Total projects
0Active
0Operational
4Withdrawn
1,200 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind41,200 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
345kV bus of Turtle Creek SubstationGEN-2021-007Wind600.0 MWwithdrawnKnox And Cedar, Nebraska
Hoskins 345 kV Substation via Turtle Creek 345 kV SubstationGEN-2023-216Wind200.0 MWwithdrawnKnox And Cedar, Nebraska
Hoskins 345 kV Substation via Turtle Creek 345 kV SubstationGEN-2023-218Wind200.0 MWwithdrawnKnox And Cedar, Nebraska
Hoskins 345 kV Substation via Turtle Creek 345 kV SubstationGEN-2023-217Wind200.0 MWwithdrawnKnox And Cedar, Nebraska

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Knox And Cedar County.

Start tracking with interXdata