Al Pastor BESS (24INR0273)

Al Pastor BESS is a 103.1 MW other interconnection project in Dawson, Texas with a current status of operational. It is proposed to connect at 1163 Lamesa Substation 138kV.

103.1 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameAl Pastor BESS
Queue ID24INR0273
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity103.1 MW
StateTexas
CountyDawson
Point of interconnection1163 Lamesa Substation 138kV
Requested (queue) date2022-03-06
Proposed in-service date2024-11-06
Operational date2024-11-01
Withdrawn date
DeveloperAl Pastor BESS LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata