Altajac (20INR0132)

Altajac is a 150.0 MW gas interconnection project in Cherokee, Texas with a current status of withdrawn. It is proposed to connect at tap 3253 Jaxvlsw to 13253 Bullard 138kV.

150.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameAltajac
Queue ID20INR0132
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity150.0 MW
StateTexas
CountyCherokee
Point of interconnectiontap 3253 Jaxvlsw to 13253 Bullard 138kV
Requested (queue) date2018-07-17
Proposed in-service date2021-04-01
Operational date
Withdrawn date2020-06-12
DeveloperAlta Power LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata