Anson Solar 1 (19INR0081)

Anson Solar 1 is a 201.5 MW solar interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at tap 345kV 68000 WShack - 68001 Clayton.

201.5 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameAnson Solar 1
Queue ID19INR0081
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity201.5 MW
StateTexas
CountyJones
Point of interconnectiontap 345kV 68000 WShack - 68001 Clayton
Requested (queue) date2017-06-22
Proposed in-service date2021-12-30
Operational date2022-01-20
Withdrawn date
DeveloperAnson Solar Center 3, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata