Armstrong Wind (18INR0029)

Armstrong Wind is a 253.0 MW wind interconnection project in Armstrong, Texas with a current status of suspended. It is proposed to connect at tap 345kV 79500 Alibates - 79503 Tule Canyon.

253.0 MWCapacity
SuspendedStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameArmstrong Wind
Queue ID18INR0029
Statussuspended
Source statussuspended
MarketERCOT
TechnologyWind
Capacity253.0 MW
StateTexas
CountyArmstrong
Point of interconnectiontap 345kV 79500 Alibates - 79503 Tule Canyon
Requested (queue) date2016-05-09
Proposed in-service date2020-03-31
Operational date
Withdrawn date2019-12-26
DeveloperBig Sky Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata