Babcock - Lake George 345 kV (J1742)

Babcock - Lake George 345 kV is a 294.1 MW solar interconnection project in Porter, Indiana with a current status of withdrawn. It is proposed to connect at Babcock - Lake George 345 kV.

294.1 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBabcock - Lake George 345 kV
Queue IDJ1742
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity294.1 MW
StateIndiana
CountyPorter
Point of interconnectionBabcock - Lake George 345 kV
Requested (queue) date2020-06-25
Proposed in-service date2023-08-01
Operational date2023-08-01
Withdrawn date2020-12-14
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.