Porter County, Indiana — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in Porter, Indiana, representing 2,926 MW of requested capacity.
16Total projects
2Active
8Operational
6Withdrawn
2,926 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 6 | 1,327 MW |
| Battery | 4 | 780 MW |
| Solar | 5 | 519 MW |
| Wind | 1 | 300 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Malden CCGT | E0035 | Gas | 1,089.8 MW | active | Porter, Indiana |
| Malden BESS | E0039 | Battery | 630.4 MW | active | Porter, Indiana |
| MISO Queue Project H087 — Wind in Porter, Indiana | H087 | Wind | 300.0 MW | withdrawn | Porter, Indiana |
| Babcock - Lake George 345 kV | J1742 | Solar | 294.1 MW | withdrawn | Porter, Indiana |
| FLINT LAKE - SOUTH VALPARAISO 138 kV | J2711 | Solar | 122.0 MW | withdrawn | Porter, Indiana |
| Starke - Flint Lake 138kV | J1960 | Solar | 100.0 MW | withdrawn | Porter, Indiana |
| Babcock - Lake George 345 kV | J1683 | Battery | 75.0 MW | withdrawn | Porter, Indiana |
| ArcelorMittal Burns Harbor | 10245_GEN7 | Gas | 63.2 MW | operational | Porter, Indiana |
| ArcelorMittal Burns Harbor | 10245_GEN5 | Gas | 62.0 MW | operational | Porter, Indiana |
| ArcelorMittal Burns Harbor | 10245_GEN6 | Gas | 51.0 MW | operational | Porter, Indiana |
| South Valparaiso 138 kV Substation | J3140 | Battery | 50.0 MW | operational | Porter, Indiana |
| Portside Energy | 55096_GT | Gas | 42.0 MW | operational | Porter, Indiana |
| Starke - Flint Lake 138kV | J1976 | Battery | 25.0 MW | withdrawn | Porter, Indiana |
| Portside Energy | 55096_ST | Gas | 19.0 MW | operational | Porter, Indiana |
| Portage Solar | 60046_PV7 | Solar | 1.5 MW | operational | Porter, Indiana |
| Valparaiso Solar, LLC | 58797_VS | Solar | 1.0 MW | operational | Porter, Indiana |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| NIPSCO | 2 | 1,720 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Porter County.
Start tracking with interXdata