Blue Star Solar (24INR0146)

Blue Star Solar is a 72.3 MW solar interconnection project in Val Verde, Texas with a current status of withdrawn. It is proposed to connect at Tap 138 kV 8998 Maxwell - 8261 Whiting Line.

72.3 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBlue Star Solar
Queue ID24INR0146
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity72.3 MW
StateTexas
CountyVal Verde
Point of interconnectionTap 138 kV 8998 Maxwell - 8261 Whiting Line
Requested (queue) date2021-11-03
Proposed in-service date2024-01-02
Operational date
Withdrawn date2022-10-03
DeveloperGH America Energy, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata