BLYTHE ENERGY PROJECT PHASE I (11A)

BLYTHE ENERGY PROJECT PHASE I is a 520.0 MW gas interconnection project in Riverside, California with a current status of operational. It is proposed to connect at Julian Hinds Substation 230kV.

520.0 MWCapacity
OperationalStatus
NorthernMarket
GasTechnology

Project facts

Canonical nameBLYTHE ENERGY PROJECT PHASE I
Queue ID11A
Statusoperational
Source statusCOMPLETED
MarketNorthern
TechnologyGas
Capacity520.0 MW
StateCalifornia
CountyRiverside
Point of interconnectionJulian Hinds Substation 230kV
Requested (queue) date2002-07-26
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.