BRP Triton BESS (24INR0111)

BRP Triton BESS is a 205.4 MW battery interconnection project in Comanche, Texas with a current status of active. It is proposed to connect at 138 kV Comanche Switch Substation (#1441).

205.4 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameBRP Triton BESS
Queue ID24INR0111
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity205.4 MW
StateTexas
CountyComanche
Point of interconnection138 kV Comanche Switch Substation (#1441)
Requested (queue) date2021-10-18
Proposed in-service date2026-12-01
Operational date
Withdrawn date
DeveloperBRP Triton BESS LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata