Buzios Solar - ADD ADDITIONAL MW CAPACITY (25INR0254)

Buzios Solar - ADD ADDITIONAL MW CAPACITY is a 51.0 MW solar interconnection project in Motley, Texas with a current status of withdrawn. It is proposed to connect at Tap between Cottonwood (#59904) and White River (#23922) 345kV.

51.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBuzios Solar - ADD ADDITIONAL MW CAPACITY
Queue ID25INR0254
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity51.0 MW
StateTexas
CountyMotley
Point of interconnectionTap between Cottonwood (#59904) and White River (#23922) 345kV
Requested (queue) date
Proposed in-service date2025-12-31
Operational date
Withdrawn date2022-11-18
DeveloperStafford Solar
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata