Cambridge CT Hybrid (2038_BA1)
Cambridge CT Hybrid is a 1.5 MW battery interconnection project in Isanti, Minnesota with a current status of active.
1.5 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology
Project facts
| Canonical name | Cambridge CT Hybrid |
|---|---|
| Queue ID | 2038_BA1 |
| Status | active |
| Source status | (U) Under construction, less than or equal to 50 percent complete |
| Market | MISO |
| Technology | Battery |
| Capacity | 1.5 MW |
| State | Minnesota |
| County | Isanti |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2026-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | GREAT RIVER ENERGY |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata