Isanti County, Minnesota — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Isanti, Minnesota, representing 587 MW of requested capacity.

11Total projects
1Active
9Operational
1Withdrawn
587 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas3419 MW
Solar4132 MW
Other125 MW
Battery310 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project G361 — Gas in Isanti, MinnesotaG361Gas210.0 MWoperationalIsanti, Minnesota
Cambridge CT Hybrid2038_GT2Gas169.2 MWoperationalIsanti, Minnesota
ISANTTI TAP to ATHNSSW 69kVJ2030Solar120.0 MWwithdrawnIsanti, Minnesota
CAMBRIDGEJ3465Gas40.0 MWoperationalIsanti, Minnesota
Cambridge CT Hybrid2038_GT1Other25.1 MWoperationalIsanti, Minnesota
Athens MN CONX62062_PV1Solar6.6 MWoperationalIsanti, Minnesota
Athens BESS62937_BABattery6.0 MWoperationalIsanti, Minnesota
Santee Solar Partners, LLC64708_C1BDNSolar3.3 MWoperationalIsanti, Minnesota
Athens - Coopers Corner BESS63090_COOPRBattery3.0 MWoperationalIsanti, Minnesota
GRE Cambridge Solar67803_PV1Solar2.0 MWoperationalIsanti, Minnesota
Cambridge CT Hybrid2038_BA1Battery1.5 MWactiveIsanti, Minnesota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.