Cambridge CT Hybrid (2038_GT1)

Cambridge CT Hybrid is a 25.1 MW other interconnection project in Isanti, Minnesota with a current status of operational.

25.1 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameCambridge CT Hybrid
Queue ID2038_GT1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity25.1 MW
StateMinnesota
CountyIsanti
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1978-05-01
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata