Cambridge CT Hybrid (2038_GT2)

Cambridge CT Hybrid is a 169.2 MW gas interconnection project in Isanti, Minnesota with a current status of operational.

169.2 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameCambridge CT Hybrid
Queue ID2038_GT2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity169.2 MW
StateMinnesota
CountyIsanti
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2007-05-01
Withdrawn date—
Developer—
Utility / transmission ownerGREAT RIVER ENERGY

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.