CAMBRIDGE (J3465)
CAMBRIDGE is a 40.0 MW gas interconnection project in Isanti, Minnesota with a current status of operational. It is proposed to connect at CAMBRIDGE.
40.0 MWCapacity
OperationalStatus
—Market
GasTechnology
Project facts
| Canonical name | CAMBRIDGE |
|---|---|
| Queue ID | J3465 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Gas |
| Capacity | 40.0 MW |
| State | Minnesota |
| County | Isanti |
| Point of interconnection | CAMBRIDGE |
| Requested (queue) date | 2024-03-27 |
| Proposed in-service date | 2026-06-01 |
| Operational date | 2026-06-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | GREAT RIVER ENERGY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.