Camp Creek Solar SLF (23INR0385)

Camp Creek Solar SLF is a 110.0 MW solar+battery interconnection project in Robertson, Texas with a current status of active. It is proposed to connect at TAP 345 KV 3400 TWIN OAK SWITCH - 46020 LIMESTONE PLANT CIRCUIT 1.

110.0 MWCapacity
ActiveStatus
ERCOTMarket
Solar+BatteryTechnology

Project facts

Canonical nameCamp Creek Solar SLF
Queue ID23INR0385
Statusactive
Source statusactive
MarketERCOT
TechnologySolar+Battery
Capacity110.0 MW
StateTexas
CountyRobertson
Point of interconnectionTAP 345 KV 3400 TWIN OAK SWITCH - 46020 LIMESTONE PLANT CIRCUIT 1
Requested (queue) date2021-12-24
Proposed in-service date2028-09-15
Operational date
Withdrawn date
DeveloperWhite Rock Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata