Canyon Wind (18INR0030)
Canyon Wind is a 308.8 MW wind interconnection project in Scurry, Texas with a current status of active. It is proposed to connect at 11319 SCOSW ScurryCounty 138kV.
308.8 MWCapacity
ActiveStatus
ERCOTMarket
WindTechnology
Project facts
| Canonical name | Canyon Wind |
|---|---|
| Queue ID | 18INR0030 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Wind |
| Capacity | 308.8 MW |
| State | Texas |
| County | Scurry |
| Point of interconnection | 11319 SCOSW ScurryCounty 138kV |
| Requested (queue) date | 2016-05-09 |
| Proposed in-service date | 2025-11-26 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Canyon Wind Energy, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata