CITY OF VERNON RENEWABLE PROJECT 2 (505)

CITY OF VERNON RENEWABLE PROJECT 2 is a 1,100.0 MW solar interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Highwind-Windhub 230kV line.

1,100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCITY OF VERNON RENEWABLE PROJECT 2
Queue ID505
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity1,100.0 MW
StateCalifornia
CountyKern
Point of interconnectionHighwind-Windhub 230kV line
Requested (queue) date2009-07-31
Proposed in-service date
Operational date
Withdrawn date2010-11-19
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.