COBALT (1757)
COBALT is a 250.0 MW solar+battery interconnection project in Riverside, California with a current status of active. It is proposed to connect at Colorado River Substation 220kV.
250.0 MWCapacity
ActiveStatus
EasternMarket
Solar+BatteryTechnology
Project facts
| Canonical name | COBALT |
|---|---|
| Queue ID | 1757 |
| Status | active |
| Source status | ACTIVE |
| Market | Eastern |
| Technology | Solar+Battery |
| Capacity | 250.0 MW |
| State | California |
| County | Riverside |
| Point of interconnection | Colorado River Substation 220kV |
| Requested (queue) date | 2020-04-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SCE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata