Coyote Ridge BESS (27INR0432)

Coyote Ridge BESS is a 111.1 MW other interconnection project in Brown, Texas with a current status of operational. It is proposed to connect at 292 Holder 138 kV.

111.1 MWCapacity
OperationalStatus
BrownMarket
OtherTechnology

Project facts

Canonical nameCoyote Ridge BESS
Queue ID27INR0432
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBrown
TechnologyOther
Capacity111.1 MW
StateTexas
CountyBrown
Point of interconnection292 Holder 138 kV
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2027-10-06
Withdrawn date
DeveloperGrenergy USA
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.