Brown County, Texas — Interconnection Projects

The interXdata warehouse tracks 23 interconnection projects in Brown, Texas, representing 4,577 MW of requested capacity.

23Total projects
3Active
13Operational
5Withdrawn
4,577 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar91,676 MW
Other61,357 MW
Battery71,217 MW
Solar+Battery1327 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Brookesmith Storage28INR0166Other351.0 MWoperationalBrown, Texas
Mountaineer Solar21INR0294Solar329.3 MWoperationalBrown, Texas
Radian Solar21INR0205Solar+Battery327.4 MWoperationalBrown, Texas
IP Radian, LLC64859_IPRADSolar320.0 MWoperationalBrown, Texas
Radian Storage II26INR0518Battery320.0 MWsuspendedBrown, Texas
Radian Storage IIB26INR0541Battery320.0 MWsuspendedBrown, Texas
Soluce Bravo Storage28INR0270Other302.6 MWoperationalBrown, Texas
Horseshoe Bend Solar19INR0075Solar301.1 MWoperationalBrown, Texas
Nouveau BESS27INR0291Other256.1 MWoperationalBrown, Texas
Blanket Ranch North Solar24INR0360Solar188.5 MWwithdrawnBrown, Texas
Zephyr Storage67555_RIC98Battery185.6 MWactiveBrown, Texas
Wetzel BESS24INR0544Other185.6 MWoperationalBrown, Texas
IP Radian, LLC64859_RADBABattery160.0 MWoperationalBrown, Texas
Chisme Storage24INR0331Other150.7 MWoperationalBrown, Texas
Chisme Solar and Storage68078_CHIPVSolar147.0 MWactiveBrown, Texas
Chisme Solar24INR0333Solar147.0 MWoperationalBrown, Texas
Chisme Solar and Storage68078_CHIBSBattery146.0 MWactiveBrown, Texas
Coyote Ridge BESS27INR0432Other111.1 MWoperationalBrown, Texas
Blanket Ranch South Solar24INR0358Solar101.3 MWwithdrawnBrown, Texas
Soluce Bravo Solar28INR0269Solar80.8 MWoperationalBrown, Texas
Radian Increase21INR0307Solar61.2 MWwithdrawnBrown, Texas
Blanket Ranch North Storage24INR0362Battery50.9 MWwithdrawnBrown, Texas
Blanket Ranch South Storage24INR0361Battery34.3 MWwithdrawnBrown, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Brown County.

Start tracking with interXdata