CPA MARICOPA SOLAR (582)

CPA MARICOPA SOLAR is a 500.0 MW solar interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Midway - Vincent #1 & #2 500kV.

500.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCPA MARICOPA SOLAR
Queue ID582
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity500.0 MW
StateCalifornia
CountyKern
Point of interconnectionMidway - Vincent #1 & #2 500kV
Requested (queue) date2010-02-01
Proposed in-service date
Operational date
Withdrawn date2011-02-17
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.