CPS Rio Nogales CT301 Rotor Replacement (24INR0602)

CPS Rio Nogales CT301 Rotor Replacement is a 3.1 MW gas interconnection project in Guadalupe, Texas with a current status of active. It is proposed to connect at 5362 RIONOG 345kV .

3.1 MWCapacity
ActiveStatus
GuadalupeMarket
GasTechnology

Project facts

Canonical nameCPS Rio Nogales CT301 Rotor Replacement
Queue ID24INR0602
Statusactive
Source status
MarketGuadalupe
TechnologyGas
Capacity3.1 MW
StateTexas
CountyGuadalupe
Point of interconnection5362 RIONOG 345kV
Requested (queue) date
Proposed in-service date2026-06-05
Operational date
Withdrawn date
DeveloperCPS Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.