CPS Energy — Interconnection Portfolio
CPS Energy is associated with 8 tracked interconnection projects representing 267 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
8Projects
3Active
5Operational
0Withdrawn
267 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 8 | 267 MW |
Portfolio by market
| Market | Projects |
|---|---|
| ERCOT | 3 |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 7 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| V H Braunig 6 | 09INR0028 | Gas | 185.0 MW | operational | — |
| CPS Energy AvR1CT2 Rotor Replacement | 25INR0531 | Gas | 23.2 MW | operational | Bexar, Texas |
| RIO NOGALES AGP UPGRADE CT3 | 20INR0272 | Gas | 19.0 MW | operational | Guadalupe, Texas |
| RIO NOGALES AGP UPGRADE CT1 | 19INR0205 | Gas | 19.0 MW | operational | Guadalupe, Texas |
| CPS AvR CT1 Rotor Replacement | 24INR0427 | Gas | 11.3 MW | operational | Bexar, Texas |
| CPS Rio Nogales CT201 Rotor Replacement | 25INR0665 | Gas | 3.1 MW | active | Guadalupe, Texas |
| Rio Nogales CT1 Rotor Replacement | 23INR0483 | Gas | 3.1 MW | active | Guadalupe, Texas |
| CPS Rio Nogales CT301 Rotor Replacement | 24INR0602 | Gas | 3.1 MW | active | Guadalupe, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor CPS Energy's portfolio across all markets.
Start tracking with interXdata