Daltus DG (22INR0461)

Daltus DG is a 19.5 MW gas interconnection project in Reeves, Texas with a current status of withdrawn. It is proposed to connect at 60721 Cryo4A 138kV.

19.5 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameDaltus DG
Queue ID22INR0461
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity19.5 MW
StateTexas
CountyReeves
Point of interconnection60721 Cryo4A 138kV
Requested (queue) date2021-03-15
Proposed in-service date2024-01-01
Operational date
Withdrawn date2022-02-21
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata