Delek Big Spring Solar (27INR0357)

Delek Big Spring Solar is a 21.4 MW solar interconnection project in Howard, Texas with a current status of withdrawn. It is proposed to connect at POI: Cosden_8 Bus #1332 138 kV POCC: Bus #1 Transformer #1 12.47 kV.

21.4 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameDelek Big Spring Solar
Queue ID27INR0357
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity21.4 MW
StateTexas
CountyHoward
Point of interconnectionPOI: Cosden_8 Bus #1332 138 kV POCC: Bus #1 Transformer #1 12.47 kV
Requested (queue) date2025-02-24
Proposed in-service date2027-06-14
Operational date
Withdrawn date2025-07-21
DeveloperTotalEnergies Distributed Generation, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata