DESERT QUARTZSITE PV (270)

DESERT QUARTZSITE PV is a 700.0 MW solar interconnection project in Riverside, California with a current status of withdrawn. It is proposed to connect at Proposed Midpoint Substation 230kV.

700.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDESERT QUARTZSITE PV
Queue ID270
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity700.0 MW
StateCalifornia
CountyRiverside
Point of interconnectionProposed Midpoint Substation 230kV
Requested (queue) date2007-11-01
Proposed in-service date
Operational date
Withdrawn date2009-12-07
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.