DRY CREEK (FKA JASMIN POWER 3) (1003)

DRY CREEK (FKA JASMIN POWER 3) is a 86.0 MW gas interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Vestal-Magunden #2 220kV line.

86.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameDRY CREEK (FKA JASMIN POWER 3)
Queue ID1003
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity86.0 MW
StateCalifornia
CountyKern
Point of interconnectionVestal-Magunden #2 220kV line
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2014-04-29
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.