Duke Energy Florida, LLC DesignatedEcho River S Lo Clar Project, (166734)

Duke Energy Florida, LLC DesignatedEcho River S Lo Clar Project, is a 74.9 MW solar interconnection project in Wakulla, Florida with a current status of withdrawn. It is proposed to connect at St. Marks Substation.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameDuke Energy Florida, LLC DesignatedEcho River S Lo Clar Project,
Queue ID166734
Statuswithdrawn
Source statusWithdrawn 12/31/2023 et ee mrc eo nn n –e Pc eti no dn
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyWakulla
Point of interconnectionSt. Marks Substation
Requested (queue) date2021-04-06
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata