Wakulla County, Florida — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Wakulla, Florida, representing 422 MW of requested capacity.
5Total projects
0Active
3Operational
2Withdrawn
422 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 2 | 270 MW |
| Solar | 3 | 152 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| S O Purdom | 689_8 | Gas | 180.0 MW | operational | Wakulla, Florida |
| S O Purdom | 689_9 | Gas | 90.1 MW | operational | Wakulla, Florida |
| Southeast Queue Project 291 — Solar in Wakulla, Florida | 291 | Solar | 74.9 MW | withdrawn | Wakulla, Florida |
| Duke Energy Florida, LLC DesignatedEcho River S Lo Clar Project, | 166734 | Solar | 74.9 MW | withdrawn | Wakulla, Florida |
| FL Solar D2, LLC | 70180_1 | Solar | 2.0 MW | operational | Wakulla, Florida |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Duke Energy Florida, LLC | 2 | 150 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: duke-def-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Wakulla County.
Start tracking with interXdata