Duke Energy Florida, LLC (074568)
Duke Energy Florida, LLC is a 74.9 MW solar interconnection project in Bay, Florida with a current status of active. It is proposed to connect at Honeybee Substation.
74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | Duke Energy Florida, LLC |
|---|---|
| Queue ID | 074568 |
| Status | active |
| Source status | Dm e c ia O re n c |
| Market | FL |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Bay |
| Point of interconnection | Honeybee Substation |
| Requested (queue) date | 2020-04-20 |
| Proposed in-service date | 2023-04-29 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Duke Energy Florida, LLC |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata