Duke Energy Progress, LLC (004910)

Duke Energy Progress, LLC is a 64.8 MW solar interconnection project in Duplin, North Carolina with a current status of operational. It is proposed to connect at Clinton - Wallace 230 kV Line.

64.8 MWCapacity
OperationalStatus
NCMarket
SolarTechnology

Project facts

Canonical nameDuke Energy Progress, LLC
Queue ID004910
Statusoperational
Source statusCommercial Operation
MarketNC
TechnologySolar
Capacity64.8 MW
StateNorth Carolina
CountyDuplin
Point of interconnectionClinton - Wallace 230 kV Line
Requested (queue) date2012-04-26
Proposed in-service date
Operational date2015-12-23
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata