Duke Energy Progress LLC (CC100070)

Duke Energy Progress LLC is a 199.0 MW battery interconnection project in Wake, North Carolina with a current status of active. It is proposed to connect at NEW TERMINAL AT PROPOSED NEW HILL 2 BESS MBSS.

199.0 MWCapacity
ActiveStatus
NCMarket
BatteryTechnology

Project facts

Canonical nameDuke Energy Progress LLC
Queue IDCC100070
Statusactive
Source statusCluster Study
MarketNC
TechnologyBattery
Capacity199.0 MW
StateNorth Carolina
CountyWake
Point of interconnectionNEW TERMINAL AT PROPOSED NEW HILL 2 BESS MBSS
Requested (queue) date2026-03-11
Proposed in-service date2034-04-15
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata