Earleys-Everetts 230 kV (AE2-037)

Earleys-Everetts 230 kV is a 71.5 MW solar interconnection project in Bertie, North Carolina with a current status of withdrawn.

71.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEarleys-Everetts 230 kV
Queue IDAE2-037
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity71.5 MW
StateNorth Carolina
CountyBertie
Point of interconnection
Requested (queue) date2019-01-18
Proposed in-service date2021-09-17
Operational date
Withdrawn date2020-04-13
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata