Falfur BESS (24INR0593)
Falfur BESS is a 9.8 MW battery interconnection project in Brooks, Texas with a current status of operational. It is proposed to connect at Connected to AEP 12.47kV Station Name (TDSP Station Code): FALFUR Load/Load Transformer Name: R1 PTI Bus Number: #8510 Voltage in kV (Transmission Level): 138kV.
Project facts
| Canonical name | Falfur BESS |
|---|---|
| Queue ID | 24INR0593 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.8 MW |
| State | Texas |
| County | Brooks |
| Point of interconnection | Connected to AEP 12.47kV Station Name (TDSP Station Code): FALFUR Load/Load Transformer Name: R1 PTI Bus Number: #8510 Voltage in kV (Transmission Level): 138kV |
| Requested (queue) date | 2023-06-27 |
| Proposed in-service date | 2025-08-06 |
| Operational date | 2025-02-03 |
| Withdrawn date | — |
| Developer | Regis Falfurrias LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata