EAST TEXAS ELECTRIC COOPERATIVE, INC. is associated with 6 tracked interconnection projects representing 679 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
6Projects
0Active
0Operational
6Withdrawn
679 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 479 MW |
| Battery | 2 | 200 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 6 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| ONALASKA | J3455 | Solar | 250.0 MW | withdrawn | Trinity, Texas |
| Batiste Creek 230kV Substation | J2817 | Solar | 120.0 MW | withdrawn | Liberty, Texas |
| Shepherd Substation | J2235 | Battery | 100.0 MW | withdrawn | San Jacinto, Texas |
| Fork Creek Substation | J2253 | Battery | 100.0 MW | withdrawn | Tyler, Texas |
| Peachtree Substation | J3425 | Solar | 59.2 MW | withdrawn | Jasper, Texas |
| Mill Creek SW Station 138 kV | J2976 | Solar | 50.0 MW | withdrawn | Jasper, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through EAST TEXAS ELECTRIC COOPERATIVE, INC..