EAST TEXAS ELECTRIC COOPERATIVE, INC. — Interconnection Queue Projects

EAST TEXAS ELECTRIC COOPERATIVE, INC. is associated with 6 tracked interconnection projects representing 679 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

6Projects
0Active
0Operational
6Withdrawn
679 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar4479 MW
Battery2200 MW

Geographic footprint

StateProjects
Texas6

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
ONALASKAJ3455Solar250.0 MWwithdrawnTrinity, Texas
Batiste Creek 230kV SubstationJ2817Solar120.0 MWwithdrawnLiberty, Texas
Shepherd SubstationJ2235Battery100.0 MWwithdrawnSan Jacinto, Texas
Fork Creek SubstationJ2253Battery100.0 MWwithdrawnTyler, Texas
Peachtree SubstationJ3425Solar59.2 MWwithdrawnJasper, Texas
Mill Creek SW Station 138 kVJ2976Solar50.0 MWwithdrawnJasper, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.