EAST TEXAS ELECTRIC COOPERATIVE, INC. — Interconnection Queue Projects

EAST TEXAS ELECTRIC COOPERATIVE, INC. is associated with 6 tracked interconnection projects representing 679 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

6Projects
0Active
0Operational
6Withdrawn
679 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar4479 MW
Battery2200 MW

Geographic footprint

StateProjects
Texas6

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
ONALASKAJ3455Solar250.0 MWwithdrawnTrinity, Texas
Batiste Creek 230kV SubstationJ2817Solar120.0 MWwithdrawnLiberty, Texas
Fork Creek SubstationJ2253Battery100.0 MWwithdrawnTyler, Texas
Shepherd SubstationJ2235Battery100.0 MWwithdrawnSan Jacinto, Texas
Peachtree SubstationJ3425Solar59.2 MWwithdrawnJasper, Texas
Mill Creek SW Station 138 kVJ2976Solar50.0 MWwithdrawnJasper, Texas

Recent material changes

ObservedProjectFieldOldNew
2026-09-24ONALASKAphaseStudy Not StartedPhase 2
2026-09-24Peachtree SubstationphaseStudy Not StartedPhase 2

Explore related data

Source last checked2026-07-31
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.